1-4) Serious plumbing
leaks and down tree limbs along Live Oak Spring road. Plumbing will
be repaired on next visit.
1-4) Disassembled
150# spring-box move up steep grade to spring site
1-2) Burned
charcoal in old spring-box flushed out of plumbing. 3-4) Burned lumber
from old spring-box removed. Took several hours.
1-4)
Preparing, assembling and fitting spring-box sides.
1-4) Final
assembly and installation of spring-box
1) The
2" gap in the rear will be filled with gravel to aid water flow into
the spring box.
2) Ralph: designer, builder and reassemble of spring-box 3) Bill: Camera
man and gopher boy
1) Soon after
the spring-box was installed, water was up to the filter and flowing
through the plumbing on it's way to Pacheco Camp a mile away.