Springs Maintenance Team (SMT) Activities, June 8-9, 2006 

060608-006ax.jpg (97225 bytes) 060608-008ax.jpg (78209 bytes) 060608-124ax.jpg (176225 bytes) 060608-011ax.jpg (141259 bytes) 060608-012ax.jpg (146493 bytes)
1-2) At Coit Rd x Steer Ridge Tr;  Timm should indicate Spike Jones Tr  3)  At Coit Spring x Cross Canyon Tr, Grapevine should indicate Cross Canyon Tr. 4&5) New laminated signs on Timm Spring Tr post, directions on Steer Ridge Tr to Grizzly Gulch Tr and Willson Camp.  Earlier ink directions will be removed on next visit. 
060608-048ax.jpg (137449 bytes) 060608-117ax.jpg (142564 bytes) 060608-113ax.jpg (135529 bytes) 060608-045ax.jpg (171778 bytes) 060608-019ax.jpg (144753 bytes)
Blue Tank: 1-3) Corrected flow from old Spring-Box, retired ~2000, into current Spring-Box 4) Flow from old Spring-Box 5) Flow into trough increased from .4 liters/min on 6/1/2006 to 2.5 liters/min.
060608-068ax.jpg (128949 bytes) 060608-073ax.jpg (102786 bytes) 060608-074ax.jpg (189369 bytes)
Rat Spring: 1)Plumbing flushed, dripping flow increased to about 2 liters per minute. 2) Water collected from shell on rear hillside 3) Heavily overgrown trail to spring brushed (.1mi).
060608-087ax.jpg (133770 bytes) 060608-088ax.jpg (87516 bytes) 060608-093ax.jpg (78272 bytes)    
Pacheco Cabin: 1-2) Dinner 3) Vandalized lock on cabin store-room replaced.  Contact Ruby for combination.
060608-126ax.jpg (132404 bytes) 060608-127ax.jpg (154716 bytes) 060608-128ax.jpg (142658 bytes)  
1-3) Post and laminated signs installed at Coit Spring Tr x Grapevine Tr intersection.
060608-134ax.jpg (139596 bytes) 060608-135ax.jpg (186104 bytes) 060608-136ax.jpg (181893 bytes) 060608-140ax.jpg (135096 bytes)  
Fern Spring: 2-3) Access to tank brushed 4) Trough water removed and brushed (pre-flushing photo)
060608-143ax.jpg (172594 bytes) 060608-144ax.jpg (133428 bytes)      
Doe Spring: 1) Spring-Box 2) Plumbing flushed and filter cleaned.