| Springs Maintenance
Team (SMT) Activities, June 3-4, 2006
|
 |
 |
 |
 |
 |
| Timm
trail & Spring |
 |
 |
 |
 |
 |
| Coit
Springs: 1-2)
Coit Camp 3) Lower Coit trough 4-5) Upper Coit Spring trough and
tank |
 |
 |
 |
|
|
| Installing
post and laminated signs at Grapevine x Coit Spring trail
intersection. |
 |
 |
 |
|
|
| 1)
Year old laminated sign to Hoover Lake 2-3) Caviata spring repair &
vapor lock moment of interest. |
 |
 |
 |
 |
 |
| Pacheco
Camp: after work social activities |
 |
 |
 |
 |
|
| Pacheco
Camp: After work social activities |
 |
 |
 |
 |
|
| Pacheco
Camp maintenance: 1) Door handle added 2-3) Weed whacking grass around
cabin 4) Removing broken branches from meadow adjacent to camp. |
 |
 |
|
|
|
| White
Tank trough and Spring box servicing. |
 |
|
|
|
|
| Pacheco
Camp closet door damage |
 |
|
|
|
|
| Blue
Tank Spring servicing: Additional work required |
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|