Springs Maintenance Team (SMT) Activities, October 15-16, 2005

051015_010a.jpg (174120 bytes)

051015_011a.jpg (130745 bytes)

051015_017a.jpg (88502 bytes)

 

 

1) Lower Coit Spring Catchment; filter cap installed 2) Upper Coit Spring Box 3) Upper Coit Tank

051015_023a.jpg (140953 bytes)

051015_030a.jpg (174247 bytes)

 

 

 

1) Coit Road 2) Bear Springs Road

051015_034a.jpg (168597 bytes)

051015_035a.jpg (165250 bytes)

051015_037a.jpg (140066 bytes)

051015_039a.jpg (233828 bytes)

 

Bear Spring West Spring Box: 1-4)  Clogged plumbing flushed,  Filter redesign under way to improve flow.

051015_041a.jpg (152257 bytes)

051015_033a.jpg (128675 bytes)

051015_043a.jpg (170526 bytes)

 

 

Bear Spring East 1) Spring Box plumbing flushed 2) Flow after flushing plumbing. 3) Cleaning trough.

 

 

 

 

 

White Tank: 1) Redesign for shutoff valve. 

051015_053a.jpg (170184 bytes)

051015_057a.jpg (173693 bytes)

051015_058a.jpg (168420 bytes)

051015_059a.jpg (98968 bytes)

051015_060a.jpg (123719 bytes)

Elderberry Spring:  1-3) Installed new filter; Gasket required 4-5) Spring Box; Cover requires additional support.

051015_062a.jpg (146291 bytes) 051015_066a.jpg (166377 bytes) 051015_067a.jpg (154344 bytes)    

Elderberry Spring:  1) Flow rate measured 2-3) Plumbing flushed with spring pump redesign.

         

Willow Ridge Trail and Spring: Downed trees remove along trail and at spring (no photos)

         

Caviata: Spring: New trough delivered to site, old trough with split bottom removed, site cleaned upPlumbing work on trough & spring box repair required (no photos)