Springs Maintenance Team (SMT) Activities, Aug 27-28, 2005

050827_008a.jpg (167934 bytes) 050827_012a.jpg (195686 bytes)

050827_016a.jpg (101809 bytes)

050827_002a.jpg (181432 bytes) 050827_023a.jpg (213939 bytes)
Woodchopper Spring: 1-2) Canteen faucet Installation 3) Tank area cleanup 4) Collecting spring flow rate data 5) Spring box seepage
050827_026a.jpg (172194 bytes) 050827_029a.jpg (125333 bytes) 050827_033a.jpg (202887 bytes) 050827_037a.jpg (177049 bytes) 050827_038a.jpg (135542 bytes)
Fern Spring: 1-3) Tank interface 4-5) Canteen faucet Installation
050827_045a.jpg (152570 bytes) 050827_049a.jpg (159836 bytes) 050827_051a.jpg (185076 bytes) 050827_055a.jpg (207457 bytes)  
Fern Spring: 1-3) Canteen faucet Installation
050827_061a.jpg (104547 bytes) 050827_062a.jpg (118546 bytes)      
Doe Spring:  1) Receiving its monthly flushing. 2)Three buckets of water into the spring box cleans out the plumbing.
050827_067a.jpg (169180 bytes) 050827_069a.jpg (147754 bytes) 050827_070a.jpg (152541 bytes) 050827_072a.jpg (157863 bytes)  
Pacheco Camp dinner, breakfast and social activities.
050827_079a.jpg (158139 bytes) 050827_083a.jpg (171706 bytes) 050827_089a.jpg (141768 bytes) 050827_091a.jpg (121235 bytes)  
White Tank Spring: 1) Prepare faucet design 2) Snake out tank overflow 3-4) Gather measurements for plumbing upgrade
050827_095a.jpg (187225 bytes) 050827_098a.jpg (150833 bytes)      
White Tank Spring: 1) Clean out trough  2) Secure overflow plumbing pressure fit
050827_107a.jpg (253478 bytes) 050827_109a.jpg (260889 bytes) 050827_114a.jpg (126615 bytes)    
Willson Hillside Spring:  Heavy runoff bypasses newly installed spring box extension.  Will fix on next visit.
050827_122a.jpg (177372 bytes) 050827_127a.jpg (175721 bytes) 050827_130a.jpg (162130 bytes)    
Willson Quartz Spring:  1-3) Leveling trough and installing new overflow gasket will eliminate hazardous marshy area around trough in a few days.