|
01/20/2005 Coit Camp
Trough Extension |
|

|

|

|

|

|
|
L>R) 1-4) In-Line Shutoff Valve to Trough
5) First Water |
|

|

|

|

|

|
| L>R) 1)
Lower Coit Tank Overflow 1 Week After Last Rain 2) Water in Cache Basin
2" Over Filter
3) Upper Trough and Tank 4) Trough
Plumbing Allows Float Removal and Faucet Installation 5) Critter Stick
Install |
| |
|
 |
|
|
| L>R) 1)
Trough, Tree, Pig Pen, Relative to Coit Road near Coit Camp |
| |
|
|
|
|
| |
|
|
|
|